自营机房
DATA CENTER
Ⅰ期機房
Phase 1 Machine room
The KF GLOBAL LIMITED Phase I engine room is first-class and has the ability to provide 7×24 carrier-grade IDC environmental protection. It provides 42U standard cabinets, each of which is equipped with dual-loop power supply. Two-way power supply, 99.9% continuous power supply guarantee; Water-cooled air-conditioning, the temperature of the equipment room is controlled at 15 to 25 degrees Celsius, and the relative humidity is 30% to 70%. The Avaya PDS integrated wiring system is used, and each rack is pre-wired with several 100MB network interfaces. 7×24 hours of professional security duty, using Fingerprint access control shield, IC access card system, 7 × 24 hours Swedish AXIS digital video surveillance system.
The KF GLOBAL LIMITED Phase I computer room covers an area of 6,000 feet and has 140 cabinets. It focuses on data center, cloud computing, big data, AI and other fields, providing professional Internet solutions for users around the world.
Phase 2 Machine room
The KF GLOBAL LIMITED Phase II computer room has a high security and high availability infrastructure. The security system includes closed-circuit television (CCTV), access control and sensors installed in every corner, and the information is transmitted to the 24x7 central monitoring center. A world-class certified data center. At the same time, we are committed to environmental protection and energy efficiency
Obtained ISO/IEC20000 and ISO/IEC27001 certification. Covering an area of 20,000 feet, it has 360 cabinets and provides a variety of facility management services including computer operation, network support, technical support, service desk, accident management, service management and other on-demand services such as backup tape installation and removal. And restart the preset equipment. It also offers a range of data connectivity services, including local and international data services, allowing customers to build reliable networks, connect to data centers and any destination.
Ⅱ期機房
III期機房
Phase 3 Machine room
The total area of the KF GLOBAL LIMITED Phase III data center is 212,100 feet. The data center is designed with Tier III+ specifications. The fully redundant infrastructure is ISO certified and certified to ensure high service availability and consistent business objectives. Professional and reliable. The award-winning.
KF GLOBAL LIMITED Phase III computer room has 7x24 security operation center and security patrol, CCTV monitoring system; multiple security monitoring and flood control gates; multiple verification access control; impact-resistant wall with intrusion detection system and road blocking device; KF GLOBAL LIMITED III The data center level is Tier3+, and the power protection has 2NUPS and N+1 generator sets. The total construction area is 212,100 feet. The computer room has an advanced temperature control system that controls the temperature of the equipment room to be 22±2C. The KF GLOBAL LIMITED Phase III Data Center provides 7×24 hours of 24/7 service support, true all-day resident engineers, and real-time detailed network monitoring to provide users with professional and intimate global Internet solutions.